Tivasa / Engineering Services
VRF / Maintenance
Maintenance Engineering

Engineered
for uptime.

Preventive, predictive and corrective VRF maintenance programs designed for cooling reliability, system performance and critical facilities.

Explore Programs
Engineering / System Reliability

Three disciplines.
One objective.

Detect degradation before it becomes an outage. Every intervention is planned, measured and documented.

Three maintenance approaches
01
Scheduled protection

Preventive

Scheduled inspection, cleaning and testing based on manufacturer guidance and site conditions.

INSPECT / CLEAN / VERIFY

02
Identify the drift

Predictive

Analysis of pressures, compressor frequency, current draw, subcooling and superheat to identify developing faults.

MEASURE / ANALYZE / ANTICIPATE

03
Restore performance

Corrective

Diagnosis and repair under agreed response arrangements, with documented root-cause analysis.

DIAGNOSE / REPAIR / DOCUMENT

02 / SERVICE INTERVALS

Maintenance
by design.

EVERY MONTH

Operational review

01

Review alarm and event logs.

02

Check operating parameters through the controller.

03

Inspect outdoor units, drains and indoor filters.

04

Verify duty/standby rotation.

SELECT SERVICE INTERVAL01 / 04

Cooling cannot
be an afterthought.

01

Concurrent maintainability

Isolate one circuit or module at a time while redundant capacity remains active.

02

Change control

Coordinate method statements, risk assessments and rollback procedures with facility operations.

03

Clean work practices

Control dust, debris and condensate near sensitive IT equipment.

04

Standby proving

Run standby equipment under load to verify readiness.

05

Critical spare parts

Plan availability of sensors, EEV coils, fan motors, PCBs and communication modules.

OPERATIONAL CONTINUITY

Measured.
Not assumed.

PERFORMANCE INDICATORS
REFERENCE FRAMEWORK
01

System availability

Cooling continuity against the agreed target

02

Response & repair time

Responsiveness under the service agreement

03

Alarm frequency

Emerging faults and unstable operation

04

Run-hour balance

Distribution of wear across modules

05

Energy trends

Efficiency losses and control drift

MEASURE / COMPARE / REPORT

Every intervention.
Documented.

01

Refrigerant management

Qualified technicians use calibrated equipment and record leaks, charge adjustments and recovered quantities by circuit.

02

Water-side systems

Where applicable, inspections include water quality, strainers and flow switches.

03

Service reporting

Each visit records work performed, measurements, findings, recommendations and replaced parts.

04

Performance review

Periodic summaries identify recurring alarms, run-hour imbalances and energy trends.

06 / SERVICE AGREEMENTS

Reliability starts
with a plan.

From scheduled preventive visits to broader service coverage with defined emergency response arrangements, remote monitoring and spare-parts provisioning.

Programs tailored to facility criticality.

Discuss Maintenance Requirements
ENGINEERING / MAINTENANCE
TIVASA